Reliance letters in design and construction
Reports are often commissioned by parties involved in the design and construction of built assets that another party (other than the original client) then has to rely on to support or inform their own activities. Under such circumstances, the author of the report might issue a reliance letter, confirming that the third party can rely on the contents of the report, or can rely on a specific part of the report.
For example, an organisation selling a site might commission an assessment of geotechnical or environmental conditions that a purchaser later relies on when deciding whether to buy the site and at what price. Under these circumstances, the author of the report might issue a letter confirming that the purchaser can rely on the contents of the report.
Such a letter might include:
- A description of the report(s) to which the letter relates.
- The reason for the reliance.
- A warrant that the author exercised reasonable skill and care in preparing the report.
- Details of the original appointment agreement, perhaps limiting liability to that under the appointment (this requires that a copy of the appointment is provided).
- Other limitations to liability, such as a limiting period.
- A licence for use of the report.
- Confirmation of professional indemnity insurance.
- Consideration from the beneficiary to the consultant.
- A right to assign the benefit of the letter (for example to funders).
- Execution, perhaps as a deed.
This can be seen as a quicker and easier arrangement than providing a collateral warranty, or relying on the provisions of the Contracts (Rights of Third Parties) Act. However, it is important to ensure that the letter is carefully drafted and that the correct details are entered. Whether the result of a reliance letter is simply a common law duty to use reasonable skill and care, or whether it amounts to a contract between the parties that may introduce a greater duty will depend on the wording of the letter.
There are four essentials of a contract:
- Two or more parties; and
- An intention to create legal relations; and
- An agreement; and
- Consideration
The two essentials that might be disputed are an intention to create legal relations and consideration. This might be demonstrated by a consideration clause and by both parties executing the letter. However, even in the absence of such provisions, it may be apparent from the actions of the parties that the recipient of the letter has relied on it to their detriment, and this may be sufficient to establish ‘consideration’.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
Comments