Reliance letters in design and construction
Reports are often commissioned by parties involved in the design and construction of built assets that another party (other than the original client) then has to rely on to support or inform their own activities. Under such circumstances, the author of the report might issue a reliance letter, confirming that the third party can rely on the contents of the report, or can rely on a specific part of the report.
For example, an organisation selling a site might commission an assessment of geotechnical or environmental conditions that a purchaser later relies on when deciding whether to buy the site and at what price. Under these circumstances, the author of the report might issue a letter confirming that the purchaser can rely on the contents of the report.
Such a letter might include:
- A description of the report(s) to which the letter relates.
- The reason for the reliance.
- A warrant that the author exercised reasonable skill and care in preparing the report.
- Details of the original appointment agreement, perhaps limiting liability to that under the appointment (this requires that a copy of the appointment is provided).
- Other limitations to liability, such as a limiting period.
- A licence for use of the report.
- Confirmation of professional indemnity insurance.
- Consideration from the beneficiary to the consultant.
- A right to assign the benefit of the letter (for example to funders).
- Execution, perhaps as a deed.
This can be seen as a quicker and easier arrangement than providing a collateral warranty, or relying on the provisions of the Contracts (Rights of Third Parties) Act. However, it is important to ensure that the letter is carefully drafted and that the correct details are entered. Whether the result of a reliance letter is simply a common law duty to use reasonable skill and care, or whether it amounts to a contract between the parties that may introduce a greater duty will depend on the wording of the letter.
There are four essentials of a contract:
- Two or more parties; and
- An intention to create legal relations; and
- An agreement; and
- Consideration
The two essentials that might be disputed are an intention to create legal relations and consideration. This might be demonstrated by a consideration clause and by both parties executing the letter. However, even in the absence of such provisions, it may be apparent from the actions of the parties that the recipient of the letter has relied on it to their detriment, and this may be sufficient to establish ‘consideration’.
[edit] Related articles on Designing Buildings Wiki
- Assignment.
- Collateral warranty.
- Third party rights.
- Letter of intent.
- Letter of appointment.
- Essentials of a contract
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.



















Comments